
Ash Handling System Overhaul
Challenge
Ash handling conveyors were undersized for the mill’s increased boiler throughput.
Approach
We replaced drag-chain conveyor sections and upsized ash handling capacity during a scheduled boiler outage.
Outcome
Capacity increase was verified the same day, one day ahead of the outage window.

